The big hill had to be trimed down to all viewing of entire layout. It was just to big. I took down 2/3 of the big hill and repaired open areas created by the demolition.
Well this photo is taken from the dorway into the train room.
frank toptrain
" It's a Heck of a Day " !!!
Country: USA ~
Posts: 7526 ~
Member Since: August 07 2008 ~
Last Visit: August 29 2025
Outside of the hill getting resized nothing else has happened to the layout. Viewing trains running has been improved. I still have to remake the tunneled exit portals of the Penn Haven side of the layout. Two tracks enter to hill on the Rock Port side and 4 tracks exit the hill on the Penn Haven side. A little bit of simple Razal Deaiz is envolved here.
frank toptrain
" It's a Heck of a Day " !!!
Edited by - toptrain on February 16 2023 07:30:46 AM
Country: USA ~
Posts: 7526 ~
Member Since: August 07 2008 ~
Last Visit: August 29 2025